This article explains the challenges faced in implementing rooftop net-metering.

To incentivise and promote solar among the masses, both state and central governments have made it mandatory for DISCOMs to roll-out Net Metering. Under Net Metering any consumer (industrial, commercial or residential) installing a rooftop solar PV system will no longer need to store the excess energy generated by the system in batteries. The additional units simply get exported to the grid and the consumer enjoys a reduction in their monthly electricity bills by subtracting the overall consumption with the exported units.

Although the policy was introduced in Maharashtra in 2015, it was made effectively utilisable by the masses only by mid-2016. With DISCOMs struggling with the lack of procedural knowledge and lack of widespread training across divisions, there has been a very slow paced implementation of roof top solar. Miscommunication persists between sub-jurisdiction offices or circle offices of the same DISCOM. For a very long time there was no clear cut idea on the role of PWD officials in granting permissions for net-metering.

We have made mammoth leaps in terms of the technology that solar power generation utilises today, but sadly, it hasn’t been recognised by the DISCOMs, as they still view solar to be an alien energy generation system or as a threat to their operations. Smart inverters of today have features such as an independent islanding system, calibrated generation meters with life generation record, independent string protection, SPDs etc that enables these energy systems to be of a plug & play configuration. Many a time the customer is asked to replace their existing CT/PT due to regulation change at DISCOM level. This is typically unnecessary for solar installation. Such roadblocks discourage customers from opting for roof top solar.

Private power utilities have been a step ahead of public utilities, in procuring and having bi-directional meters for both LT and HT consumers readily available with testing facilities in place. For the public sector, due to its long drawn out procurement procedure, the customer till date has to procure the energy meter and have it tested by the nearest testing division. The sheer amount of liaisoning work involved, along with the unnecessary and repetitive documentation filing makes anyone think twice before recommending roof top solar under net metering.

Advertising

EPR Android App Banner

Authored by_

Uday Doshi,
Founder
Excelsior Engineering Solutions,
Mumbai

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Nirmal Wires
Nirmal Wires
Android App
Android App

Events

Power Gen
Power Gen
India Energy Storage Week 2025
India Energy Storage Week 2025
GOTS 2025
GOTS 2025
Renewable Energy India (REI)
Renewable Energy India (REI)
BEDIC
BEDIC
MEPIC
MEPIC

Our Sponsors

Geda
Geda
Kimbal
Kimbal
BCH India
BCH India
Kp Group
Kp Group
Voltaredox
Voltaredox
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
Apar Industries
Apar Industries
Ravin Group
Ravin Group
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Balaji Switchgears
Balaji Switchgears
Gloster Cables Limited
Gloster Cables Limited
HPL Electric Power
HPL Electric Power
K-Lite Industries
K-Lite Industries
Newtech Switchgear
Newtech Switchgear
Elev8 Lift
Elev8 Lift
flir system
flir system
ET Transformers
ET Transformers
Polycab
Polycab
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
OBO Engineered Cable Trays
OBO Engineered Cable Trays
Siemens Energy
Siemens Energy
Radicon Powerbuild
Radicon Powerbuild
MENNEKES Electric India
MENNEKES Electric India
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA
TDK Electronics
TDK Electronics