Megger
Megger
Rayzon
Rayzon
EPR Subscription Banner
EPR Subscription Banner
Home » News » Nuclear power sector to get major boost: Minister

Nuclear power sector to get major boost: Minister 

By August 2, 2024 2:00 pm IST

Nuclear power sector to get major boost: Minister 
.

Union Minister of State for Atomic Energy Jitendra Singh announced that nine reactors with a total capacity of 7,300 MW are currently under construction, plans underway for twelve reactors.

Ambitious expansion of nuclear reactors are underway in the country. Nine reactors with a total capacity of 7,300 MW are currently under construction and plans for twelve reactors are underway as part of the country’s strategic push to enhance its nuclear capabilities. This was informed by the Minister Jitendra Singh in response to a question in the Lok Sabha on Thursday. 

Singh reassured the public regarding the safety standards of these facilities, affirming that “there are no discrepancies in operational safety of nuclear power plants.” He emphasised that these plants are managed by highly trained personnel, and operational safety protocols are subject to regular reviews and enhancements by the Atomic Energy Regulatory Board (AERB).

Advertising

EPR Android App Banner

The minister also outlined the extensive measures in place to assess and monitor the health impact of nuclear facilities on local populations. He noted that leading local medical colleges, in collaboration with Tata Memorial Hospital in Mumbai, conduct routine health assessments for residents living near these plants. According to these studies, there has been no adverse effect on the health of surrounding communities due to the operations of the nuclear power plants.

In addition to reactor expansions, Singh highlighted the development of a new Nuclear Fuel Complex (NFC) at Rawatbhata, Kota, Rajasthan. This facility, which includes a PHWR Fuel Fabrication Facility and a Zircaloy Fabrication Facility, aims to produce 500 tonnes of fuel tubes annually. With an investment of Rs 4,256.20 crore, the project, located approximately 50 km from Kota, is nearing completion and represents a significant advancement towards achieving greater nuclear fuel self-sufficiency for India.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Nirmal Wires
Nirmal Wires
Android App
Android App

Events

Wiretech 2025
Wiretech 2025
Power Gen
Power Gen
World Utilities Congress
World Utilities Congress
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
Harting
Harting
Doble Engineering
Doble Engineering
CSE Power
CSE Power
Nirmal
Nirmal
Ravin Group
Ravin Group
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Neo Tele Tronixl Pvt Ltd
Neo Tele Tronixl Pvt Ltd
ZIEHL ABEGG
ZIEHL ABEGG
Power Electronical
Power Electronical
Deep Sea Electronics
Deep Sea Electronics
Supremesolar
Supremesolar
Elev8 Lift
Elev8 Lift
Synthesis Winding Technologies Pvt Ltd
Synthesis Winding Technologies Pvt Ltd
flir system
flir system
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Powerica LTD
Powerica LTD
Eaton
Eaton
AEEPL
AEEPL
MENNEKES Electric India
MENNEKES Electric India
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA