Cost and availability challenges in the  renewable energy business
.

In 2010, the Government of India launched the ambitious Jawaharlal Nehru National Solar Mission to pivot away from fossil fuels and embrace sustainable and environmentally friendly energy sources while addressing India’s energy security challenges. Under this mission, the total installed capacity target was 20 gigawatts (GW) by 2022. Later, in 2015, the target was revised to 100 GW, with no change in the timeline. Once again, in August 2021, the government increased the target to 300 GW for 2030— in line with India’s Intended Nationally Determined Contributions (INDCs) target to achieve about 40 percent cumulative electric power installed capacity from non-fossil fuel-based energy resources.

Challenges in achieving renewable energy targets
Barriers to achieving this target include regulatory roadblocks, net metering limits, the twin burdens of basic customs duty (BCD) on imported cells and modules, issues with the Approved List of Models and Manufacturers (ALMM), unsigned power supply agreements (PSAs) and restrictions on the banking of renewable energy; an increase in GST; financing issues; delays in or rejection of open access approval grants; and the unpredictability of future open access charges.

Measures to mitigate challenges
Some short- and long-term measures that could help India get back on track to meet its solar targets include: implementing uniform and consistent regulations for

Advertising

EPR Android App Banner

Initiatives from SunPower Renewables
India has set aggressive but achievable future energy demand and sustainability targets, and there needs to be a systematic. A sustained effort from the government is required to reduce fossil fuel consumption while adding renewable options with energy storage in all three segments—utility-scale projects, industrial production, and captive consumer consumption. With our innovative and smart era portable solar generators, we aim to contribute to this change in the Indian energy landscape by replacing diesel generators with a cleaner, greener, and cheaper alternative. Also, this replaces lead-acid batteries with a more efficient, portable, and technically superior alternative that will increase the adoption of renewable energy in the country.

Expertise shared by Rahul Kale,Founder & CEO, Nitasha Badhwar,Co-Founder & Head of Strategy at SunPower Renewables

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Nirmal Wires
Nirmal Wires
Android App
Android App

Events

Wiretech 2025
Wiretech 2025
Power Gen
Power Gen
GOTS 2025
GOTS 2025
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Greenfinity Powertech Pvt Ltd
Greenfinity Powertech Pvt Ltd
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Kp Group
Kp Group
Adani Solar
Adani Solar
Fluke
Fluke
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Icon Solar-En Power
Icon Solar-En Power
Mtekpro Technologies
Mtekpro Technologies
Novasys
Novasys
Testo India
Testo India
Timken
Timken
OEN
OEN
Sun Bond
Sun Bond
Orange Power
Orange Power
S K Industrial
S K Industrial
Elev8 Lift
Elev8 Lift
flir system
flir system
Omicron
Omicron
DEIF
DEIF
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA
Sun Cables
Sun Cables