The Anatomy Solar Structure Design
.

Solar power systems have an average life cycle of 25 years. Hence it is essential that structures supporting them in place are of superior quality to match the weathering and stress endured over the period.

Structures are an integral part of any solar PV system. Be it ground mount or roof-top module mounting structures, the structures are the elements anchoring the modules in place, preventing them from flying off due to the action of wind forces. The structures based on location dictate at what angle the modules need to be inclined at for optimum generation throughout the year. A solar power system is expected to have an average life cycle of 25 years. Therefore it is essential that structures supporting them in place are of superior quality to match the weathering and stress endured over this period.

Structures and foundations need to be designed according to the codes that apply as per local site conditions and the contour of land. The design of module mounting structure is different for each project. The structure itself should not cast a shadow on adjacent or subsequent row of modules. The findings of the geo-technical report needs to be taken into consideration while designing the foundation. The type of soil, composition of soil and depth of water table are some of the aspects that dictate the foundation design. Pullout tests are to be performed at site prior to commencement of construction in full swing to understand its true effectiveness in comparison with the calculated simulations. The mixing of concrete and curing period needs to be followed as per the specifications mentioned in the design document. Onsite fabrication of structures could lead to inconsistencies which could cause delays during installations and needs to be averted as much as possible. Hence a pre-check or a demo setup of one table at the fabrication unit is highly recommended. The skill of local labour available also affects the quality of workmanship being executed at site.

Structures could be made from mild steel that is then hot dip galvanised or could be made from cold formed GI sections. For rooftop installations aluminium structures are preferred due to its light weight nature coupled with heavy load bearing capacities. The thickness and quality of galvanisation determines its ability to withstand rusting. Only galvanised or stainless steel fasteners of appropriate grade based on their application should be used. The contractor should use a torque wrench and follow the tightening torques mentioned in the design document for the fasteners.

For rooftop installations, aluminium structures are preferred due to their light weight nature coupled with heavy load bearing capacities. It is crucial that the module mounting system is designed as per the type of roof on which instillation is to be carried out. Be it an RCC flat roof, sloping asbestos roof or a trapezoidal sheet roof; the integrity of the roof and its overall load bearing capacity needs to be considered before selecting a module mounting system. Unlike ground mount projects, where the inter row spacing is inevitable, care needs to be taken while designing roof top structures to provide adequate access and walkways for carrying out maintenance activities in the future. Where penetrative structures are being used it is necessary to ensure that the water proofing of the roof is intact and sealants are being used to prevent seepage of water during monsoon.

With the immense market competition and falling prices, contractors have begun compromising on the design, quality and workmanship. There has been a rise in the rate of failure of structures. Be it in terms of sagging of structure members, foundation failure or even the inability to withstand wind speeds far lower than designed criteria, the quality of module mounting structures needs to be closely monitored before and during construction. Structures aren’t technology interactive to be actively monitored like in the case of inverters. However, history has shown us that even the failure of a single structure leads to a cascading domino effect, damaging the adjacent structures with it thereby halting the plant`s generation. Such incidents could have a negative impact on the project Internal Rate of Return (IRR).

Authored by_
Uday Doshi, Founder,
Excelsior engineering Solutions, Mumbai

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Power Talk
Webinar
Webinar
Android App
Android App
EPR eMagazine April 2024
EPR eMagazine April 2024
EPR eMagazine April 2024

Events

RenewX India
RenewX India
International Geotechnical Innovation Conference
International Geotechnical Innovation Conference
EL Asia
EL Asia
Global Energy Digitalisation Conclave
Global Energy Digitalisation Conclave
World battery and energy storage industry expo
World battery and energy storage industry expo
Green Hydrogen Summit
Green Hydrogen Summit
POWERGEN India
POWERGEN India
Windergy
Windergy

Our Sponsors

Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Doble Engineering
Doble Engineering
Allied Power Solutions
Allied Power Solutions
Nirmal
Nirmal
KEI Industries Limited
KEI Industries Limited
Maco Corporation India Pvt Ltd
Maco Corporation India Pvt Ltd
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Icon Solar-En Power
Icon Solar-En Power
Novasys
Novasys
Testo India
Testo India
Mecc-Alte India
Mecc-Alte India
Newtech Switchgear
Newtech Switchgear
Triveni Turbine ltd
Triveni Turbine ltd
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Winsun
Winsun
A-1 ELECTRICALS
A-1 ELECTRICALS
Allied Moulded Enclosure Products
Allied Moulded Enclosure Products
ANUSHREE ELECTRICAL ENGINEERS
ANUSHREE ELECTRICAL ENGINEERS
Ashone Technologies
Ashone Technologies
Citroen Switchgears Pvt. Ltd.
Citroen Switchgears Pvt. Ltd.
Electrotherm
Electrotherm
KVTEK Power Systems
KVTEK Power Systems
MENNEKES Electric India
MENNEKES Electric India
Om Technical Solutions
Om Technical Solutions
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA
Motwane Manufacturing
Motwane Manufacturing