Ganz Electric
Ganz Electric
Rayzon
Rayzon
EPR Subscription Banner
EPR Subscription Banner
Home » News » SECI reschedules pre-bid meeting for 2,000-MW ISTS-connected wind project

SECI reschedules pre-bid meeting for 2,000-MW ISTS-connected wind project

By April 29, 2020 12:04 pm IST

SECI reschedules pre-bid meeting for 2,000-MW ISTS-connected wind project
.

The Solar Energy Corporation of India (SECI) on Friday said it has rescheduled the pre-bid meeting date for setting up of 2,000-MW interstate transmission-connected windpower projects to 30 April, 2020.

It added that the meeting would be conducted through video-conferencing, and invitations to the meeting will be sent on 29 April, 2020.

Advertising

EPR Android App Banner

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Tags: News
Nirmal Wires
Nirmal Wires
Webinar
Webinar
Android App
Android App

Events

RenewX
RenewX
Wiretech 2025
Wiretech 2025
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Our Sponsors

Transormer India
Transormer India
Mahindra Powerol
Mahindra Powerol
Transwind Tech
Transwind Tech
Elmeasure
Elmeasure
Apsol
Apsol
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
Akansha
Akansha
Hitachi Energy
Hitachi Energy
Nirmal
Nirmal
Aramco Asia
Aramco Asia
KEI Industries Limited
KEI Industries Limited
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Testo India
Testo India
Rectifiers & Electronics
Rectifiers & Electronics
Elev8 Lift
Elev8 Lift
Ganz Electric
Ganz Electric
Kirloskar Pumps
Kirloskar Pumps
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Eaton
Eaton
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA