Ganz Electric
Ganz Electric
Rayzon
Rayzon
EPR Subscription Banner
EPR Subscription Banner
Home » News » Tata Power bags 330-MW solar project in Madhya Pradesh

Tata Power bags 330-MW solar project in Madhya Pradesh

By September 3, 2021 10:52 am IST

Tata Power bags 330-MW solar project in Madhya Pradesh
.

The projects will be set up at the Neemuch Solar Park in Neemuch district in Madhya Pradesh.

TP Saurya Limited (TPSL), a wholly-owned subsidiary of Tata Power, has received a Letter of Award (LoA) from Rewa Ultra Mega Solar Limited (RUMSL) to build 330 MW (Unit-1: 160 MW + Unit-2: 170 MW) of solar project in Neemuch Solar Park of Madhya Pradesh. This project has been awarded through tariff-based competitive bidding followed by an e-Reverse auction. 

The Chief Minister of Madhya Pradesh Shivraj Singh Chouhan, in the presence of Hardeep Singh Dang, Minister of Department of New and Renewable Energy; Sanjay Dubey (IAS), Principal Secretary; Akash Tripathi (IAS), MD, MP Power Management Company Limited (MPPMCL); and other key dignitaries handed over the LOA to Ashish Khanna, President, Renewables, Tata Power.

Advertising

EPR Android App Banner

Speaking on the achievement, Dr Praveer Sinha, CEO & MD, Tata Power said, “We are glad to receive this prestigious order for development and operation of 330 MW solar project from Rewa Ultra Mega Solar in Madhya Pradesh. We have been progressively growing our portfolio of grid-scale solar plants across the country.”

The projects will be set up at the Neemuch Solar Park in Neemuch district in Madhya Pradesh and the energy will be supplied to the Indian Railways and the Madhya Pradesh Power Management Company Limited under Power Purchase Agreement (PPA) valid for a period of 25 years. The company has won this capacity in a bid finalised through reverse auction by RUMSL. The project will be commissioned within 19 months from the date of execution of the PPA.

With this, the total renewable capacity of Tata Power will reach 4,361 MW with an installed capacity of 2,947 MW and 1,414 MW under implementation.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Tags: News
Nirmal Wires
Nirmal Wires
Webinar
Webinar
Android App
Android App

Events

RenewX
RenewX
Wiretech 2025
Wiretech 2025
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Our Sponsors

Transormer India
Transormer India
Mahindra Powerol
Mahindra Powerol
Transwind Tech
Transwind Tech
Elmeasure
Elmeasure
Apsol
Apsol
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
Akansha
Akansha
Hitachi Energy
Hitachi Energy
Nirmal
Nirmal
Aramco Asia
Aramco Asia
KEI Industries Limited
KEI Industries Limited
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Testo India
Testo India
Rectifiers & Electronics
Rectifiers & Electronics
Elev8 Lift
Elev8 Lift
Ganz Electric
Ganz Electric
Kirloskar Pumps
Kirloskar Pumps
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Eaton
Eaton
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA