Promonique
TCI
Rayzon
Home » Power Brand » Minutes instead of days: Reduced assembly time of machining centres

Minutes instead of days: Reduced assembly time of machining centres

By January 3, 2019 5:30 pm IST

Minutes instead of days: Reduced assembly time of machining centres

In its robotic machining centres, many companies use fully harnessed energy chain systems from igus. This cuts out many process steps for the manufacturer, reducing assembly time from several weeks to just half a day.

In very few industries, the throughput time is as important as in the machine tool industry. Cutting out individual work steps means achieving considerable savings in process costs. In developing CNC equipment industry, precision and reliability are critical factors. Therefore, it is important to have a reliable means of energy supply from the switch cabinet to the moving parts, which include spindles and motors. At the same time, all the information regarding axis position and dynamics must be passed back to the control system without any interruption. All this happens at accelerations of up to 0.5 g and a maximum travel speed of up to 60 m/min.

Reliable complete solution from a single source

Advertising

EPR Android App Banner

Work steps cut out for significantly greater productivity
Normally, machine tool manufacturers try to avoid too much different work steps being carried out on a system at the same time. A lot of manual work done by different employees does not necessarily enhance efficiency; on the contrary, it increases the probability that errors can occur. By using igus readychains, all four e-chains from igus can be fully installed in half a day. Readychain is able to cut out some work steps, reduce process cost and, at the same time, greatly improve productivity.

igus energy chains, including cables and mounting frame, are delivered as fully-assembled readychains. The energy supply systems are then fitted within half a day instead of several weeks. (Source: igus GmbH) Robotic machining systems, energy chains from igus ensure a safe and reliable energy supply. (Source: igus GmbH)

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Android App
Power Talk
webinar

Events

Renewable Energy India (REI)
ELAsia 2026

Our Sponsors

Kimbal
Wika
Transwind Tech
Panasonic Life Solutions India Pvt Ltd
Rayzon Solar Pvt Ltd
Andritz Hydro Pvt Ltd
Joint Well
NBC Bearings
Allied Power Solutions
Apar Industries
Ravin Group
Meco Instruments Pvt Ltd
Godrej Boyce
Lucy Electric
Novasys
BRACO ELECTRICALS PVT.LTD
Guru Teg Bahadur Metal Works
phoenix Contact Pvt Ltd
Myraid Industrial Solutions LLP
Sunbond Energy Pvt Ltd
KPI Green Energy Ltd
Balaji Switchgears
S K Industrial
Rectifiers & Electronics
Synthesis Winding Technologies Pvt Ltd
flir system
Omicron
DEIF
Eplan
EMR
Kirloskar Pumps
Ultra Electric India
Polycab
Electrotherment
Aeron Composite Pvt Ltd
Delta
A-1 ELECTRICALS
MENNEKES Electric India
PRAMA HIKVISION INDIA
Ultra Electric India