Ganz Electric
Ganz Electric
Rayzon
Rayzon
EPR Subscription Banner
EPR Subscription Banner
Home » Power Update » BHEL commissions two hydropower generating units in Arunachal Pradesh

BHEL commissions two hydropower generating units in Arunachal Pradesh

By April 23, 2020 2:33 pm IST

BHEL commissions two hydropower generating units in Arunachal Pradesh
.

Bharat Heavy Electricals Limited (BHEL) has successfully commissioned two units of 4×150 MW Kameng Hydroelectric Project (HEP) in Arunachal Pradesh. Notably, this is the largest unit rating (150 MW) for hydropower generating sets in the state of Arunachal Pradesh. Being developed by North Eastern Electric Power Corporation Limited (NEEPCO), the greenfield hydro project is located in West Kameng district of Arunachal Pradesh. Kameng HEP is a run-of-the-river scheme which will utilise the flow from Bichom and Tenga rivers.

Significantly, the Francis Turbine commissioned in the project is designed to operate at rated head of 501 metres, making it the highest head Francis Type Hydro Turbine in the country. On commissioning of all four units, the project will be able to generate 3,353 million units (MU) of clean electricity annually. BHEL’s scope in the project comprises design, manufacture, supply, installation and commissioning of four 150 MW Vertical Francis Turbines and matching Synchronous Generators, Transformers, Control & Monitoring (SCADA) system along with associated auxiliaries. The equipment have been supplied by BHEL’s manufacturing units at Bhopal, Jhansi, Rudrapur, and Bengaluru, while erection and commissioning on site was carried out by the company’s Power Sector – Eastern Region division, Kolkata.

Advertising

EPR Android App Banner

BHEL has made significant contribution to the hydro sector of Arunachal Pradesh and has commissioned 710 MW of hydropower projects in the state so far, accounting for around 84 percent of the total installed capacity in the state. BHEL is presently executing hydroelectric projects of 5.8 GW, which includes 2.6 GW of projects within the country and 3.2 GW abroad. In addition, BHEL is also carrying out comprehensive renovation and modernisation of more than 699 MW hydro projects across the country. Significantly, more than 500 hydroelectric generating sets of various ratings have been ordered on BHEL with a cumulative capacity of more than 30 GW, including 6.7 GW for overseas projects. BHEL’s hydro plants are successfully performing in India and across the world, including countries such as Afghanistan, Azerbaijan, Bhutan, Malaysia, Taiwan, Tajikistan, Rwanda, Thailand, New Zealand, Nepal, and Vietnam.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Tags: Power Update
Android App
Android App

Events

RenewX
RenewX
Wiretech 2025
Wiretech 2025
Power Gen
Power Gen
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Our Sponsors

Transormer India
Transormer India
Mahindra Powerol
Mahindra Powerol
Transwind Tech
Transwind Tech
Elmeasure
Elmeasure
Apsol
Apsol
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
Akansha
Akansha
Hitachi Energy
Hitachi Energy
Nirmal
Nirmal
Aramco Asia
Aramco Asia
KEI Industries Limited
KEI Industries Limited
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Testo India
Testo India
Rectifiers & Electronics
Rectifiers & Electronics
Elev8 Lift
Elev8 Lift
Ganz Electric
Ganz Electric
Kirloskar Pumps
Kirloskar Pumps
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Eaton
Eaton
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA