Any cost incurred or spent on smart grid equipment like Fault Passage Indicators (FPIs), Auto-reclosers and Load Break Switches (LBS) can typically be recovered within 2 to 3 years. This is achieved through quicker grid…
Industry studies suggest that leaks in compressed air systems can account for up to 30 percent of energy waste. Compressed air leaks are often harder to detect than other types…