Any cost incurred or spent on smart grid equipment like Fault Passage Indicators (FPIs), Auto-reclosers and Load Break Switches (LBS) can typically be recovered within 2 to 3 years. This is achieved through quicker grid…
Captive and other mines produced 18.95 MT, reflecting a significant growth of 29.61 percent compared to 14.62 MT in the corresponding period of the last year. The total coal production…