Suzlon Group produces its first blade for the New S111 2.1 MW Turbine
By EPR Magazine Editorial November 6, 2014 1:00 am IST
By EPR Magazine Editorial November 6, 2014 1:00 am IST
Wind turbine maker Suzlon Group has completed the production of its first blade for its S111 2.1 MW turbine. The S111 is a technologically advanced product of the S88 and S97 2.1 MW family. This product has been specifically designed for Suzlon’s next generation 2.1 MW turbine and is engineered to deliver a 20 per cent increase in AEP (Annual Energy Production) at the same hub height compared to Suzlon’s S97 wind turbine model.
The S111 is built on the proven reliability of the S88 and S95/97 2.1MW family that currently has over 3100 turbines installed in fifteen different countries with over 68,000,000 operating hours. The blade is designed to harness the optimal available wind resources and deliver higher energy productivity, which in turn ensures higher ROI to customers. Suzlon turbines have been setting industry benchmarks across the entire technology value chain by meeting new standards.
We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.