Financial assistance provided to CVPPPL for development, construction, and operation of the 624 MW run-of-river scheme. REC Limited, a Maharatna Central Public Sector Enterprise and leading NBFC under the Ministry…
Successful diversion of Chenab river expedites construction, paving the way for scheduled commissioning in 2026. A significant milestone was reached at the Ratle Hydro Electric Project in Jammu & Kashmir,…
Strategic agreement with Rajasthan Urja Vikas solidifies commitment to sustainable hydroelectric power development. Ratle Hydro Electric Power Corporation Limited (RHPCL), a joint venture between NHPC Limited and Jammu and Kashmir…
The milestone was achieved with dam construction at elevation level 210 m above sea level. The construction of the dam until the top level of Elevation Level (EL) 210 M…